Override rates per project

❤️ Gathering votes
Kevin

I would love it if we could override the default hourly rate on a per-project basis. Not all of our clients are the same or wanted to be treated the same (we have clients that want a priority rate so they're always first in line).

5 months ago

Activity
Martin Lonsky | APUtime

Hello Kevin 🙂 Thansks a lot, that makes sense. Also connected with possibility to set default project if adding task from non project scope (my schedule for example)

0    5 months ago    Reply

Martin Lonsky | APUtime changed status to ❤️ Gathering votes

5 months ago

 
)